五五字典>英语词典>written report翻译和用法

written report

英 [ˈrɪtn rɪˈpɔːt]

美 [ˈrɪtn rɪˈpɔːrt]

书面报告,报告书

经济

英英释义

noun

  • a written document describing the findings of some individual or group
    1. this accords with the recent study by Hill and Dale
    Synonym:reportstudy

双语例句

  • Teams will document their efforts in a written report and make a formal presentation of their results.
    团队需要提交纪录专案过程的书面报告,并正式报告专案结果。
  • There will be a brief oral and written report due in the second class based on your fact-finding.
    第二次课,在你们事实发掘的基础上,做一个简短的口头和书面报告。
  • If you are unfamiliar with the hazards associated with a particular gas, contact your supplier for additional information. Monitoring civil progress compared to schedule& come up periodical written report.
    如果你对与特定气体相联系的危险不熟悉,请与你的供应商联系,以得到补充资料。参照时间表监控工地进度并定期提交书面报告。
  • Seller must attach written report stating details and results of inspection to such Quality Certificate.
    卖方应将记载检验细节和结果的书面报告附在质量证明书内。
  • After demanding the material be cut from the written report, health ministry speakers at the conference surprised and puzzled foreign researchers by including the details about premature deaths in their oral presentation.
    在要求从书面报告中删除相关资料之后,卫生部发言人却在会上的口头陈述中包括了有关早亡的细节,这令外国研究者感到惊讶和困惑。
  • Take notes during the consultation as the final written report is very concise.
    磋商的时候要作记录,因为最终的书面报告非常简洁。
  • For the group project you will work in teams and hand in only one written report.
    对于专题作业,必须组队完成,并且全组只要交一份报告即可。
  • Problems sets and written report should not by turned in after the due dates ( late) unless arrangements are made with me.
    习题集和写作报告一律应在规定的时间内交上,除非和我协商。
  • In addition to the written report, Amtrak shall submit the track geometry data measured during the most recent track geometry inspection run prior to the test.
    除了书面报告以外,amtrak应当在试验之前,提交在最新的轨道几何形状检查中测得的轨道几何形状数据。
  • Verify dimensions and plumb of all elevator hoistways, prior to preparing shop drawings, and submit a written report to engineer detailing any proposed modification to suit the site conditions.
    编制施工图之前,校验所有电梯机井的尺寸和垂直度,并向监理工程师提交一份书面报告,详细说明任何根据现场条件拟作出的修改。